Summer Construction 2024
Jun 18, 2024 | 9:50 am
The Urbana campus will feature more than 40 active construction projects this summer.
The Urbana campus will feature more than 40 active construction projects this summer. Upgrades to facilities and infrastructure are vital to meeting the university’s strategic goals and include classroom and laboratory modernizations, roof replacements, accessibility improvements, street repairs, life-safety advancements, restroom enhancements, and utilities system revitalization in support of energy production, distribution, and conservation efforts.
For a complete list of projects and a corresponding map of the work, go to https://go.fs.illinois.edu/SummerConstruction.
Here are some of the notable projects:
- Illini Union – Roof Replacement
- Memorial Stadium – South Concourse and Restroom Renovations
- Altgeld Hall – Exterior Renovation
- Steven S. Wymer Hall – New Facility
- Beckman Institute for Advanced Science and Technology – Cafe Renovation
- Krannert Center for the Performing Arts – Roof Replacement/Accessibility and Elevator Upgrades
- Allen Hall – Electrical Systems Improvements
- Engineering Sciences Building – Chilled Water Expansion
- Siebel Center for Design – Laser Cutter Exhaust System
- Music Building – North Entrance Concrete
- Everitt Laboratory – 2nd Floor Laboratory Renovation