EPC 04 - Abbott Power Plant

Started: 29/08/2016

Completed: 06/01/2017

The project resulted in an estimated $200K savings annually. 

Abbott Power Plant – EPC Project 04 (U15057)

Under a $2.18M contract, energy services company Noresco installed cooling coils, a chiller, and pumps to make the power plant’s combustion turbine operate more efficiently. and improve power output. The project results in an estimated $200K savings annually.

Notable Energy Conservation Measures 

  • Water Cooled Chiller
  • Chilled Water Coils