Renovation
EPC 04 - Abbott Power Plant
Started: 29/08/2016
Completed: 06/01/2017
The project resulted in an estimated $200K savings annually.
Documents
Abbott Power Plant – EPC Project 04 (U15057)
Under a $2.18M contract, energy services company Noresco installed cooling coils, a chiller, and pumps to make the power plant’s combustion turbine operate more efficiently. and improve power output. The project results in an estimated $200K savings annually.
Notable Energy Conservation Measures
- Water Cooled Chiller
- Chilled Water Coils