menu-hamburger
Renovation

EPC 06 - Campus Chilled Water System Optimization

Started: 13/11/2023

Completed: 09/30/2024

Installed OptimumLOOP control software at Oak Street and North Campus Chiller Plants to enhance system performance.

  • Awarded to Veregy Central, LLC
  • $2,499,000 contract value
  • $264,971 guaranteed annual energy cost savings
  • 10-year payback with guaranteed energy cost savings only

Installed OptimumLOOP control software at Oak Street and North Campus Chiller Plants to enhance system performance. Its proprietary algorithms continuously analyze and adjust operations in real time, optimizing control of chilled water plant equipment for maximum efficiency. The cloud-based OptiCx platform provides operators with valuable insights, including key performance indicators (KPIs) and data analytics, enabling quick detection, diagnosis, and resolution of system faults.