Utilities & Energy Services – 2025 Summer Projects
Started:
Projected electrical, water, steam, storm, sanitary, and energy conservation projects this summer.

Links
Documents
Utilities Distribution Projects
Chilled Water
- 24″ connection under the Boneyard Creek
Electrical
- Agricultural Engineering Sciences Building – Electrical Feeder Replacement
- Davenport Hall – Electrical Service Upgrade
- Kenny Gymnasium – Electrical Service Upgrade
- Load Center #38 – Feeder Cable Replacement
- Music Building – Electrical Feeder replacement
- Natural Resources Building – West Transformer Replacement
- Rehabilitation Education Center – Electrical Service Upgrade
- Southeast Substation 69KV transformer refurbishment.
- Veterinary Teaching Hospital – Oncology Center – Transformer and Electrical Feeder
Sanitary Sewer
- Main Quad Camera Inspection – Areas Between Green Street, Gregory Drive, Wright Street, and Goodwin Avenue
- Mathews Avenue – Lift Station Renovation
- 297 LF of 10” Cured In Place Pipe (CIPP) Liner Installed by a Contractor Near the Printing and Photographic Services Building on Gregory Street
Steam
- Gregory Place 2 – High- and Low-Pressure steam and Condensate systems Replacement in Shallow Tunnel
- Florida Avenue Residence Halls – Steam Service Supply Replacement
- Transportation Building – Parking Lot Steam and Condensate Systems Replacement in Shallow Tunnel
Water
• Replacing two 80 year-old left-hand valves with two right-hand valves
- #1 – Peabody Avenue and Sixth Street southeast of Krannert Art Museum
- #2 – Springfield Avenue southeast of Kenney Gym
Energy Management Services
Digital control system upgrades will occur in these facilities:
- Wohlers Hall
- Beckman Institute for Advanced Science and Technology
- Law Building
- Micro and Nanotechnology Laboratory
- Armory
Retrocommissioning (RCx)
More information on this composite building optimization process is available on the RCx web page.
- Allen Residence Hall
- Lincoln Avenue Residence Hall
- Loomis Laboratory
- Public Safety Building